Installation process: marking and positioning → water-coated installation of aluminum alloy doors and windows → anti-corrosion treatment → installation of aluminum alloy doors and windows → fixation of aluminum alloy windows → processing of gaps between door and window frames and walls → installation of door and window sash and door and window glass → installation of hardware accessories.

 

1. Marking and positioning (1) According to the installation position, size and elevation of the doors and windows in the design drawings, measure the door and window edges to both sides according to the center line of the doors and windows. If it is a multi-story or high-rise building, the edge of the door and window on the top floor shall be used as the standard. Use a line drop or theodolite to guide the edge of the door and window downward, and mark the doors and windows on each floor. Individual edges that are not straight should be chiseled. (2) The horizontal position of doors and windows should be based on the horizontal line of +50cm in the floor room, and measure the height of the lower skin of the window upwards, and find the straight line. Each layer must maintain the same height under the windows.

 

2. Installation of the aluminum alloy window water cover. Fix the water cover on the aluminum alloy window according to the requirements of the construction drawings, and ensure that the position is correct and the installation is firm.

 

3. Anti-corrosion treatment (1) When the design requires anti-corrosion treatment for the outer surfaces around the door and window frames, it shall be treated according to the design requirements. If the design does not require it, anti-corrosion coatings or plastic films can be applied for protection to prevent the cement mortar from directly contacting the surface of the aluminum alloy doors and windows, causing an electrochemical reaction and corroding the aluminum alloy doors and windows. (2) When installing aluminum alloy doors and windows, if connecting iron parts are used to fix them, it is best to use stainless steel parts for connecting iron parts, fixings and other installation metal parts. Otherwise, anti-corrosion treatment must be carried out to avoid electrochemical reactions and corrosion of aluminum alloy doors and windows.

 

4. Install aluminum alloy doors and windows in place according to the marked door and window positioning lines, and install aluminum alloy door and window frames. And promptly adjust the horizontal, vertical and diagonal lengths of door and window frames to meet quality standards, and then temporarily fix them with wooden wedges.

 

5. Fixing of aluminum alloy doors and windows (1) When there are iron parts embedded in the wall, the iron feet of the aluminum alloy doors and windows can be welded directly to the embedded iron parts in the wall. The welding joint needs to be rust-proofed. . (2) When there are no iron parts embedded in the wall, metal expansion bolts or plastic expansion bolts can be used to fix the iron feet of aluminum alloy doors and windows to the wall. (3) When there are no embedded iron parts in the wall, you can also use an electric drill to drill a hole 80mm deep and 6mm in diameter in the wall, using L-shaped 80mm×50mm 6rmn steel bars. Apply 108 glue grout to the long end and drive it into the hole. After the 108 cement slurry has finally set, weld the iron legs of the aluminum alloy doors and windows to the embedded 6mm steel bars.

 

6. Treatment of the gap between the door and window frame and the wall (1) After the aluminum alloy doors and windows are installed and fixed, the concealed engineering acceptance should be carried out first. After passing the inspection, the gap between the door and window frame and the wall should be processed in a timely manner according to the design requirements. (2) If the design does not require it, elastic insulation materials or glass wool felt strips can be used to fill the gaps in layers, leaving a 5~8mm deep groove on the outer surface to fill with caulking grease or sealant.

 

7. Installation of door and window sashes and door and window glass (1) Door and window sashes and door and window glass should be installed after the completion and acceptance of the surface decoration of the opening wall. (2) After the sliding door and window are installed and fixed in the door and window frame, install the door and window sash with glass into the chute in the frame, and adjust the gap with the sash. (3) For casement doors and windows, the frame and fan lattice are assembled on the wall, and the glass is installed after the installation and fixation. That is, first adjust the gap between the frame and the fan, then install the glass into the fan and adjust the position, and finally inlay the sealing strip and Sealant. (4) Floor spring doors should be installed after the door frame and floor spring host are installed and fixed on the ground before installing the door leaf. First, insert the glass into the door leaf grid and put it into the frame together, adjust the frame and leaf gaps, and finally fill in the sealing strips and sealant of the door leaf glass.

 